What to Send for a Curtain Wall Glass Quote

Latest Updated:

Home / Blog /

What to Send for a Curtain Wall Glass Quote

For a curtain wall glass quote, start with the latest glass schedule, dimensioned drawings, and quantities by glass ID. If some details are still under review, mark them against the relevant panels. That lets the glass manufacturer identify which panels can be priced, which can be estimated with stated assumptions, and which need more information.

A useful quote shows the drawing revision, sizes, quantities and glass makeup it’s based on. It should also make clear which fabrication, packing and delivery costs are included. Those details give you a basis for comparing suppliers and updating the price when a drawing changes.

Download the PDF Checklist

Match the glass schedule to the drawings and quantities

Follow one glass ID through the documents

Start with a glass type that accounts for a good share of the order. Suppose G-01 is the vision glass on the typical floors, with 120 panels in the quantity schedule. Find it on the elevation, check the glass makeup in the schedule, then match the sizes to the drawing. If G-01 comes in two widths, give each width its own line and quantity. That makes it easier to see what needs to be repriced if one width changes.

Identify the size shown on the drawing

A frame opening dimension and a finished glass dimension describe different things. If you only have opening sizes, label them as such. The manufacturer can then tell you whether those dimensions are sufficient for a budget estimate. Before production, the finished glass dimensions need to be confirmed by your project team for the framing system.

If you have only an estimated façade area, include how it was calculated and which glass makeup you’re considering. Typical panel sizes and a rough count of shaped panels can also help the manufacturer judge what can reasonably be estimated.

Low E Glass Curtain Wall for Modern Commercial Buildings

Record the drawing revision and what changed

When the drawings are updated, send the revised pages with the glass IDs affected. A short note such as “Rev. B changes the G-01 quantity and the G-02 panel height” gives the manufacturer a clear basis for revising those lines.

If the glass schedule and detail drawing disagree, identify the conflict and have the project team confirm which information governs. For an interim estimate, record any agreed assumption on the quote so it can be checked later.

Compare the glass makeup before comparing prices

Two quotes can both say “Low-E insulating glass” and show the same overall thickness while pricing different glass. Take one glass ID and ask each supplier for the full makeup, from outside to inside. That usually makes the comparison more useful than starting with the unit price.

Check the outer pane, cavity and inner pane

When comparing insulating glass units, look for the glass type, thickness and heat treatment of each pane. Where a pane is made with laminated glass, check the thickness of each glass layer and the interlayer type and thickness. For the cavity, check the width and gas fill, along with any spacer or edge-seal requirements in the project documents.

Ask for the Low-E coating model and surface

In a double-glazed unit made with two single panes, surface #2 is the cavity-facing side of the outer pane. Surface #3 is the cavity-facing side of the inner pane. A description such as “coating on the inside” leaves room for interpretation. The coating model and surface number give the buyer, design team and manufacturer the same configuration to review.

low-e-glass-igu-cross-section-coating

If the project calls for a specific Low-E coating and allows alternatives, ask for the original and the proposed alternative on separate lines. If the schedule only says “Low-E,” send the appearance and performance targets your team has agreed on. Ask each supplier to name the coating it has priced and show the full makeup. Your project team can then review a specific proposal.

Check what each performance figure represents

A center-of-glass U-value can help you compare two glass options. If the project calls for a U-value for the whole curtain wall assembly, you’ll need data for the relevant assembly. When comparing U-value, solar heat gain coefficient (SHGC) or visible transmittance (VT), check what each figure applies to and whether the data use the same basis.

Put the commercial terms on the same basis

Once the glass and quantities match, check the fabrication, samples, inspection records and reports included in each quote. For specified documents, confirm which glass types they cover.

Check whether pricing is per panel or per square metre, then compare the currency, packing, freight, delivery terms and named destination. Ask what starts the lead time. A lead time measured from drawing approval may represent a different delivery schedule from one measured from sample approval.

Insulated Glass Curtain Wall

Price what’s ready and identify what still needs review

Standard floor panels, corner panels and panels with alternative coatings can sit on the same request. Give each line enough context for the manufacturer to handle it appropriately.

Glass IDCurrent informationWhat to ask the manufacturer to do
G-01 · Typical floorsFinished sizes, glass makeup and 120 panels are confirmed.Price against Rev. B and record the revision on the quote.
G-02 · CornersAbout 24 panels. Finished sizes and outer-pane heat treatment are under review.List separately. If an estimate is possible, show the dimensions and makeup assumed.
G-03 · Shaded area36 panels. The project has a named coating and one alternative under consideration.Price both options separately and show the coating model and surface for each.

The glass IDs and quantities are illustrative.

If a corner panel is awaiting wind-load review, keep that status against its glass ID. If the shading or coating changes, flag the affected panels so the project design team can decide whether to revisit the thermal stress assessment. The design team confirms the project requirements. The glass manufacturer can review the resulting makeup and drawings for fabrication and update the relevant quote lines once the details are available.

Confirm fabrication, samples and delivery before production

Start with the panels that have special fabrication

For panels that need custom glass processing, such as holes, cutouts, angled edges or special edgework, match each detail drawing to its glass ID. A note such as “hole 50 mm from edge” should identify the reference edge and make clear whether the dimension runs to the hole centre or its edge. For an asymmetric panel, also check which face the drawing shows.

Insulated Glass Glass Filling

Cutting, drilling and notching are done before heat treatment for heat-strengthened or fully tempered glass. Reviewing these details before the order is released gives the buyer and manufacturer time to resolve any ambiguity in the drawing.

Agree on what the sample will be used to approve

If the sample is for exterior colour approval, identify the reference sample or coating the project team wants to compare it with. If transparent vision glass sits next to opaque spandrel glass that conceals the floor slab, review the two together when a coordinated appearance is required. Record the approved pair against the relevant glass IDs.

When discussing glass quality checks, share the project requirements for size tolerances, appearance criteria or specific reports. The manufacturer can confirm which checks and documents are included and raise any items that need to be agreed before production.

Plan the packing around the way the site will receive the glass

If installation starts on the lower floors, share the floor or zone sequence when discussing delivery. Confirm whether the glass can be packed by batch and what the crate labels need to show. Where freight is part of the quote, give the named delivery location and the delivery terms you want priced. These details help the site team identify the right crates when the first batch arrives.

What to check at each stage

For a budget estimate

Use the drawings, quantities and glass makeup available today. Identify the size basis and record what’s pending. Ask the supplier to show the assumptions used for any provisional prices.

When comparing quotes

Match the glass ID, revision, sizes, quantities and full makeup. Then compare fabrication, samples, documents, packing, freight and the lead-time start point. Keep alternatives visible on separate lines.

Before releasing the order

Check the approved glass schedule against the finished sizes, quantities and fabrication drawings. Confirm the approved samples, acceptance requirements, documents, crate labels and delivery batches.

Common questions about curtain wall glass quotes

Can I ask for an estimate with just the façade area?

Yes, you can begin with an estimated area. If you have typical panel sizes, a proposed glass makeup or details of any shaped panels, include those too. The manufacturer can tell you whether there’s enough information to estimate and what assumptions the estimate would use.

Low E Insulated Glass Processing

What if the schedule just says “Low-E”?

Send the appearance and performance requirements you have. Ask each supplier to show the coating model, coated surface and complete glass makeup in its quote. If an alternative is proposed, ask for it on a separate line so your project team can review it.

Do I need to resend the whole drawing set after a revision?

For a change limited to specific panels, send the revised pages and identify the affected glass IDs. Include changes to dimensions, quantities, glass makeup, holes or edges. Before production, check that the quote, glass schedule and fabrication drawings refer to the agreed revisions.

Sharing your project with HEXAD

A short note alongside your drawings can be enough to explain what you need from this round of pricing. For example:

We’re preparing a budget for the typical floors. The attached Rev. B schedule covers G-01. The finished sizes and outer-pane heat treatment for G-02 are still under review. Could you price G-01 and show G-02 separately if there’s enough information for an estimate?

When you request a curtain wall glass quote from HEXAD, you can use the schedule you already have and point us to the panels you’d like priced first. We can review the glass makeup and fabrication details, explain the basis of any estimate, and identify the items that need confirmation for a firm quote.